Related Experiment Video
Updated: May 4, 2026

11:53
The Modular Design and Production of an Intelligent Robot Based on a Closed-Loop Control Strategy
Published on: October 14, 2017
12.1K
Inverse scheduling method for aircraft flat-tail assembly production based on improved genetic algorithm
Tengda Li1,2, Min Hua3, Junliang Wang4
1Shanghai Jiao Tong University, USC-SJTU Institute of Cultural and Creative Industry, Shanghai, 200240, China.
Scientific Reports
|November 17, 2025
Summary
This study introduces inverse scheduling for aircraft flat-tail assembly, optimizing production by minimizing delay and adjustment costs. The novel approach enhances efficiency and handles disruptions effectively in complex manufacturing.
Area of Science:
- Aerospace Engineering
- Manufacturing Systems
- Operations Research
Background:
- Aircraft flat-tail assembly manufacturing is complex, manual, and prone to scheduling disruptions.
- Existing scheduling methods struggle with uncertainties, leading to suboptimal or infeasible production plans.
- Disruptions in complex assembly systems necessitate advanced scheduling strategies.
Purpose of the Study:
- To develop and apply an inverse scheduling strategy for aircraft flat-tail assembly production.
- To present a multi-objective optimization model for inverse scheduling, focusing on delay and adjustment costs.
- To introduce an improved genetic algorithm for solving large-scale inverse scheduling problems.
Main Methods:
- Formulated a multi-objective optimization model for inverse scheduling.
- Developed an improved genetic algorithm (GA) integrating local search for efficiency.
- Designed a self-adaptive tolerance-driving mechanism for handling exceptions and enhancing GA performance.
- Validated the inverse scheduling strategy and mechanism through enterprise case studies.
Main Results:
- The proposed inverse scheduling method significantly outperforms traditional rescheduling strategies.
- Achieved reductions in sequence adjustment and material handling costs.
- Demonstrated the effectiveness of the self-adaptive tolerance-driving mechanism in managing order delays.
- Verified the practical applicability and efficiency of the inverse scheduling approach.
Conclusions:
- Inverse scheduling offers a more practical and efficient solution for disruptions in complex aircraft assembly.
- The improved GA with a self-adaptive mechanism effectively addresses large-scale inverse scheduling problems.
- This research provides a novel and effective approach to enhance production scheduling in aerospace manufacturing.

