Related Experiment Video
Updated: Jan 10, 2026

Novel Triple-Loop Technique for Suturing TFCC Injuries without Transosseous Tunnel
Published on: May 23, 2025
Revisiting the Critical Pathology of Primary Thumb Trapeziometacarpal Osteoarthritis: Volar Beak Ligament
Vincent D Pellegrini1, Michael W Fort2, Emmalin B Nelton3
1Geisel School of Medicine at Dartmouth, Hanover, NH; Dartmouth Hitchcock Medical Center, Department of Orthopaedics, One Medical Center Drive, Lebanon, NH.
Purpose:
Volar and dorsal capsular contributions to trapeziometacarpal joint stability have been extensively studied in laboratory models. We investigated the less-understood relationship between trapeziometacarpal joint osteoarthritis and capsuloligamentous integrity in human thumbs.
Methods:
Eighty thumb trapeziometacarpal joints from two distinct groups of 20 anatomical donors were prospectively specified for dissection through either a dorsal (20 men, 20 women; mean age 83 (72-100) years) or volar (24 men, 16 women; mean age 90 (76-100) years) arthrotomy. One thumb evidenced prior anatomical dissection, another underwent surgical arthrodesis, and 78 were anatomically undisturbed. Seven joints exhibited inflammatory arthritis, leaving 71 available for study. Capsuloligamentous structures were characterized through an opposite side arthrotomy, and articular surfaces were stained with methylene blue. Trapezium/metacarpal surface eburnation ratios were calculated using ImageJ analysis and digitally summed to display aggregate topographical wear pattern heat maps by arthritis stage.
Results:
Osteoarthritic eburnation was similar in both arthrotomy groups. Twenty (28%) joints contained no surface eburnation, 15 (21%) early osteoarthritis, 17 (24%) advanced osteoarthritis, and 19 (27%) end-stage osteoarthritis. Early arthritis specimens exhibited greater trapezial than metacarpal eburnation; Trapezium/metacarpal ratios were 1.22, 1.07, and 0.98 for early, advanced, and end-stage, respectively. Through a dorsal arthrotomy, complete beak ligament detachment from the metacarpal was observed in 8 of 8 end-stage, 7 of 8 advanced, and 6 of 7 early osteoarthritis specimens. Eleven of 12 thumbs without eburnation exhibited no beak ligament degeneration. Through a volar arthrotomy, none of 36 specimens exhibited dorsal capsuloligamentous degeneration irrespective of articular surface eburnation.
Conclusions:
Volar beak ligament detachment from the thumb metacarpal, not dorsal capsular degeneration, is strongly associated with trapeziometacarpal osteoarthritis in elderly cadaveric thumbs. Greater trapezial eburnation in early-stage osteoarthritis suggests translational metacarpal instability.
Clinical Relevance:
Volar beak ligament degeneration and trapeziometacarpal instability represent the primary pathology associated with age-related osteoarthritis and should inform surgical treatment.
More Related Videos
06:28Anterior Cruciate Ligament Transection and Synovial Fluid Lavage in a Rodent Model to Study Joint Inflammation and Posttraumatic Osteoarthritis
Published on: September 2, 2025
07:24Autologous Microfractured and Purified Adipose Tissue for Arthroscopic Management of Osteochondral Lesions of the Talus
Published on: January 23, 2018
Related Concept Videos
Bones of the Upper Limb: Radius
The radius has a nail-shaped head, and a...
Ankle Joint
Development of the Limb Synovial Joints
The mesenchymal stem cells differentiate into chondrocytes that form the hyaline cartilage, and later the cartilaginous model of the bone. This model further transforms into a bone. This process is known as endochondral ossification.
During development, the limbs...
Bones of the Upper Limb: Ulna
Bones of the Upper Limb: Humerus