Research on reasonable length of steeply dipping coal seam working face based on the fuzzy comprehensive evaluation

Huiyang Zhang1, Zhongping Guo2, Fei Ma3

  • 1School of Energy and Mining Engineering, Shandong University of Science and Technology, Qingdao, 266590, Shandong, China.

Scientific Reports
|November 26, 2025
PubMed

Related Concept Videos

Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
388
Compacting Factor test01:22

Compacting Factor test

The compacting factor test is a method used to assess the workability of concrete. It is  especially suitable for concrete mixes containing aggregates up to one and a half inches in size. This test involves specialized equipment consisting of two truncated cone-shaped hoppers and a cylinder, all with polished interior surfaces to minimize friction.
The procedure begins by placing concrete into the upper hopper without any compaction. Once filled, the bottom door of this hopper is opened,...
528
Field Procedure for Staking Out Curves01:26

Field Procedure for Staking Out Curves

Staking out curves is an essential process in construction to ensure the accurate alignment of structures along a curved path. This task involves positioning stakes at calculated locations corresponding to the curve's design, effectively translating plans into physical markers in the field. The process begins by determining the geometric parameters of the curve, including the radius, central angle, and tangent distances. These parameters are critical for identifying key points such as the...
419
Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
270
Adjusting a Traverse01:12

Adjusting a Traverse

In the site survey of a four-sided traverse, internal angles are essential to ensure geometric accuracy. The survey revealed that the sum of the measured internal angles was 359 degrees and 48 minutes, which is 12 minutes less than the expected 360 degrees. This discrepancy signals an error likely arising from measurement inaccuracies during the fieldwork.To rectify this error, the adjustment process involved distributing the 12-minute shortfall equally across the four internal angles. By...
349