Drilling down on roster design: comparing fly-in fly-out roster patterns in the West Australian mining industry
Tim D Smithies1,2, Grace E Vincent1, Sally A Ferguson1
1Appleton Institute and School of Health, Medical and Applied Sciences, Central Queensland University, 44 Greenhill Road, Wayville, Adelaide, South Australia 5034, Australia.
Abstract:
Roster schedule design is integral to an effective Fatigue Risk Management System, and can impact worker health, safety, employee satisfaction, psychological health, productivity, and cost. However, fatigue-based roster scheduling decisions are frequently made using little or no supporting data. This analysis aims to provide objective fatigue-risk data for roster schedules commonly used within Western Australian mining fly-in-fly-out operations. Ten of the most common roster schedules within the abovementioned context were identified, as were two highly pertinent factors: day/night shift start/finish times, and commute duration to/from individuals' home airports. In total, 150 combinations of roster schedules, shift start/finish times, and commute durations were analyzed using the Fatigue Audit InterDyne (FAID®, Interdynamics Pty Ltd) Standard biomathematical model. Through this analysis, we show that earlier shift start/finish times increase predicted fatigue-risk for day shifts and decrease predicted fatigue-risk for night shifts. Additionally, when finishing a roster schedule on night shifts, much of the commute home from the airport may be at a high fatigue-risk. This risk further increases when the roster includes later finish times. This project presents a comprehensive data-driven comparison of fly-in fly-out shifts and roster schedules specific to Western Australian fly-in fly-out mining operations. The results from this novel analysis should not be used in a prescriptive manner; however, they aim to provide new insight that may assist decision-making around roster scheduling for fly-in fly-out mining operations globally.
More Related Videos
06:22The Floating Lab: Standard Operational Procedure for Collecting and Filtering Seawater Samples from Operating Ferries for Environmental DNA Analysis
Published on: August 1, 2025
14:55Analysis of Minerals Produced by hFOB 1.19 and Saos-2 Cells Using Transmission Electron Microscopy with Energy Dispersive X-ray Microanalysis
Published on: June 24, 2018
Related Concept Videos
Relative Frequency Histogram
Relative Frequency Distribution
Fixed Action Patterns
Quarrying of Stone
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
Determination of Expected Frequency
Construction of Frequency Distribution
First, make a table with two columns—one with the title of the data that needs to be organized, and the other column for frequency. [Draw a third column for tally marks if needed]. Then, take a look at the items given in the data set and decide if an ungrouped frequency distribution table or a grouped frequency distribution table would be more suitable. If there are large sets of different values, then it is...