Ground control strategies for longwall top-coal caving panel in extra-thick coal seams with thick-hard roof

Rui Wang1, Wei-Guang Zhang2, Hao-Sen Wang3

  • 1Key Laboratory of Xinjiang Coal Resources Green Mining, Xinjiang Key Laboratory of Coal-bearing Resources Exploration and Exploitation, Xinjiang Engineering Research Center of Green Intelligent Coal Mining, Xinjiang Institute of Engineering, Ürümqi, 830023, China. rwang@cumt.edu.cn.

Scientific Reports
|March 18, 2026
PubMed

Related Concept Videos

Cavity Drainage and Flashings in Masonry walls01:20

Cavity Drainage and Flashings in Masonry walls

Typically, a cavity wall consists of two wythes separated by a gap of at least 2 inches, which may contain insulation while still maintaining a minimum clear space of 1 inch to facilitate adequate drainage. Advanced methods like the insertion of a continuous drainage mat can further reduce this space while ensuring effective moisture expulsion.
Weep holes, strategically placed at the base of the cavity, are critical for draining accumulated water. These openings are created by leaving head...
559
Masonry Curtain Walls01:20

Masonry Curtain Walls

Masonry curtain walls employ brick or stone veneers supported by the building's structure to form an external cladding system that is both aesthetically appealing and functional. These walls are erected through two principal techniques, first by traditional layering of masonry units and second by using prefabricated panels. Traditional construction relies on steel shelf angles attached to the spandrel beam for support, with high-bond mortars ensuring secure attachment of masonry veneer...
1.9K
Masonry Cavity Walls01:26

Masonry Cavity Walls

Cavity walls feature a hollow space between the outer and inner wythes, connected only by corrosion-resistant metal ties. When water seeps through the outer wythe, it descends within this cavity, intercepted by flashing and eventually exiting through weep holes. To enhance moisture resistance, the inner wythe's cavity side often receives damp-proofing, doubling as an air barrier. The cavity can also house insulation to mitigate heat transfer.
Maintaining a clean cavity during construction...
1.6K
Quarrying of Stone01:15

Quarrying of Stone

Quarrying is the process of extracting stone from a quarry, where specialized techniques are employed to remove large blocks of stone safely and efficiently. This process can involve controlled explosions or more precision-oriented methods such as cutting and drilling.
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
709
Taping Over Different Ground Profiles01:12

Taping Over Different Ground Profiles

Taping over varying ground profiles requires careful adaptation to achieve accurate measurements. On smooth, level ground with minimal vegetation, the tape can rest directly on the ground. Here, the taping team, typically consisting of a head and a rear tapeman, coordinates their positions with clear communication. The rear tapeman holds the tape at the starting point and guides the head tapeman toward a range pole placed beyond the endpoint, using hand or voice signals to ensure alignment.On...
443
Posttensioned Masonry Walls01:15

Posttensioned Masonry Walls


Post-tensioned masonry walls use high-strength steel rods or flexible tendons to enhance the strength and efficiency of masonry structures. These elements are securely anchored to the foundation and extend vertically either within the cores of the masonry units or between the masonry wythes. The construction process involves building the wall with these tensioning elements in place and allowing the mortar to fully cure.
Following the curing process, the tensioning begins. Steel rods are...
569