Reactive power planning based on a proposed voltage stability index in power systems with renewable energy resources

M Sonbol1, Omar H Abdalla2, Abdulla M Shaheen3

  • 1Faculty of Engineering, Helwan University, Cairo, Egypt. engsonbol@yahoo.com.

Scientific Reports
|April 2, 2026
PubMed

Related Concept Videos

Control of Power Flow01:30

Control of Power Flow

There are several methods to control power flow in power systems:
770
The Power Flow Problem and Solution01:26

The Power Flow Problem and Solution

Power flow problem analysis is fundamental for determining real and reactive power flows in network components, such as transmission lines, transformers, and loads. The power system's single-line diagram provides data on the bus, transmission line, and transformer. Each bus k in the system is characterized by four key variables: voltage magnitude Vk​, phase angle δk​, real power Pk​, and reactive power Qk​. Two of these four variables are inputs, while the power flow program computes...
990
Generator Voltage Control01:21

Generator Voltage Control

Generator voltage control is crucial for maintaining the stable operation of synchronous generators and wind turbines. In older models, a DC generator driven by the rotor delivers DC power to the rotor's field winding, and the power is transferred through slip rings and brushes. In the latest models, static or brushless exciters are used. Static exciters rectify AC power from the generator terminals and then transfer the DC power directly to the rotor. Brushless exciters, on the other hand, use...
790
Load-frequency control01:28

Load-frequency control

Load-frequency control (LFC) is vital for maintaining power system stability, ensuring that frequency and power flows remain within acceptable limits during load changes. Turbine-governor control eliminates rotor accelerations and decelerations following load changes. However, a steady-state frequency error persists when the change in the turbine-governor reference setting is zero. In an interconnected power system, each area agrees to export or import a scheduled amount of power through...
794
Turbine-Governor Control01:17

Turbine-Governor Control

Turbine-governor control is crucial for maintaining power system stability by balancing turbine mechanical power output with electrical load demand. This mechanism ensures that generator frequency and rotor speed are within acceptable limits during load variations. Turbine-generator units store kinetic energy due to their rotating masses; this energy is released to meet the load requirement when the load increases. The electrical torque of turbines rises to meet the demand, whereas the...
1.1K
Maximum Power Flow and Line Loadability01:23

Maximum Power Flow and Line Loadability

The maximum power flow for lossy transmission lines is derived using ABCD parameters in phasor form. These parameters create a matrix relationship between the sending-end and receiving-end voltages and currents, allowing the determination of the receiving-end current. This relationship facilitates calculating the complex power delivered to the receiving end, from which real and reactive power components are derived.
717