Industrial effluent impact on Wabe River: a QUAL2Kw water quality simulation

Edimealem Geremew Melka1, Tamru Tesseme Aragaw2

  • 1Hydraulic and Water Resources Engineering Department, Wolaita Sodo University, Wolaita Sodo, Ethiopia. edimealem.geremew@wsu.edu.et.

Related Concept Videos

Quality of Water01:19

Quality of Water

In concrete preparation, the quality of water is paramount as it affects the strength and durability of the concrete. Potable water is usually preferred; however, it must not have excessive sodium or potassium to prevent compromising the concrete's integrity. Water quality is typically evaluated based on impurities such as dissolved solids, chlorides, and sulfates, and its pH value is ideally between 6 and 8. Even slightly acidic natural water may be acceptable unless it contains harmful...
705
Testing Water Quality01:14

Testing Water Quality

When the quality of water for concrete preparation is uncertain, its impact on the setting time of cement and compressive strength of mortar is assessed by comparison with de-ionized or distilled water benchmarks. American Society for Testing and Materials (ASTM) C1602 requires the setting times to be within 90 minutes of the control, British Standard (BS) 3146:1980 allows a 30-minute variance in the initial setting, while British Standards European Norm (BS EN) 1008 specifies initial setting...
552
Typical Model Studies01:30

Typical Model Studies

Fluid mechanics model studies often utilize scaled-down systems to predict fluid behavior in full-scale environments, such as river flows, dam spillways, and structures interacting with open surfaces. Maintaining Froude number similarity in river models is crucial, as it replicates surface flow features like wave patterns and velocities.
687
Weir: Problem Solving01:26

Weir: Problem Solving

Water flow in open channels is often measured using hydraulic structures such as weirs, which allow precise calculation of discharge. In a rectangular channel, flow rates are measured using three types of weirs: rectangular sharp-crested, triangular sharp-crested, and broad-crested. The weir head is set at a fixed height above the channel bottom, simplifying calculations and enabling the relationship between depth and flow rate to be analyzed.For the rectangular sharp-crested weir, the flow...
762