Stability Evaluation and Design Optimization of Underground Salt Caverns for CAES Under Static and Long-Term Load
Hong Ke1,2, Hongling Ma3, Yebing Hong2
1College for Elite Engineers, China University of Geosciences, Wuhan 430074, China.
Abstract:
At present, research on the long-term stability of multi-cavern coordinated injection-production operations for salt cavern compressed air energy storage (CAES) remains limited. Large-capacity energy storage utilizing multiple interconnected salt caverns has become an inevitable development trend for modern CAES power stations, highlighting the necessity and importance of stability evaluation and design optimization for underground salt cavern storage clusters. Based on the Anning 350 MW CAES demonstration project, this paper takes the abandoned salt caverns of the project as research objects. A three-dimensional geological and cavern model is established using the FLAC3D numerical simulation method, and stability analysis is carried out under static conditions and three long-term gas injection and production scenarios (the pressure conditions are provided by ground-based equipment). The characteristics of the plastic zone, displacement, stress distribution, and volume shrinkage of the caverns are systematically investigated. The results show that under static conditions, the internal pressure significantly controls the development of the plastic zone, and the caverns are generally stable at pressures above 4 MPa. During long-term operation, the plastic zones of each cavern gradually expand, displacements accumulate continuously, and stresses tend to stabilize after an initial accumulation period. After 30 years of operation, no through-going plastic zones appear in any cavern, and all volume shrinkage rates are below 30%. Among the three cases, Case 1 exhibits the best stability, while enhanced monitoring is required for local high-stress regions in Case 3. This study verifies that the salt cavern development for the Anning CAES project is safe and controllable during long-term operation. The layout spacing of caverns is reasonably designed and fully satisfies the stability requirements of salt cavern CAES power stations. The research results can provide a technical guarantee for the construction of the first CAES power station in Yunnan Province and also offer a reliable reference for the design and construction of similar multi-cavity salt cavern CAES projects.
Related Concept Videos
Indeterminate Structure
Stability of structures
Design Consideration
The factor of safety is another key aspect...
Design Example: Managing Concrete Workability
To address...
Eccentric Loading
Design of Columns under an Eccentric Load