Functional connectivity networks for transportation delay analysis: From theory to software
Related Experiment Video
Updated: Sep 14, 2026

Modeling the Functional Network for Spatial Navigation in the Human Brain
Published on: October 13, 2023
Carlson Moses Büth1, Massimiliano Zanin2
1Institute for Cross-Disciplinary Physics and Complex Systems (IFISC), CSIC-UIB, 07122, Palma de Mallorca, Spain.
Abstract:
Within the endeavour of modelling and understanding the propagation of delays in transportation networks, an approach that has attracted increasing interest in the last decade is the creation of functional network representations. These graphs map elements of interest (e.g. airports or stations) as nodes, and derive pairwise dependency patterns from their dynamics through correlation and causality tests. In spite of multiple notable results, this approach still lacks a coherent framework, with decisions related to many fundamental steps being left to the judgement of the researcher. We here provide an introduction to the theory behind functional networks for transportation systems, detailing the main steps and the associated pitfalls. We further introduce a Python package, delaynet, designed to support the researcher in the reconstruction and analysis of such networks. We finally present an analysis of the propagation of delays in the Swiss train system; and discuss future research steps.
More Related Videos
11:41Evaluation of an Exclusive Spur Dike U-Turn Design with Radar-Collected Data and Simulation
Published on: February 1, 2020
09:01A Method for Investigating Age-related Differences in the Functional Connectivity of Cognitive Control Networks Associated with Dimensional Change Card Sort Performance
Published on: May 7, 2014
Related Concept Videos
Network Function of a Circuit
Manipulation and Analysis
Fast Decoupled and DC Powerflow
Circuit Terminology
A circuit, on the other hand, is also an interconnected system of electrical elements but must contain one or more closed paths.
Introduction to Limits
Pharmacodynamic Models: Link Model and Systems Pharmacodynamic Model