A VHF-Voltage Double Time Integral Method for Apparent-Charge Estimation of Partial Discharge in Gas-Insulated

Subin Gao1, Xiaoli Zhou1, Chao Pan2

  • 1College of Intelligent Robotics and Advanced Manufacturing, Fudan University, Shanghai 200433, China.

Related Concept Videos

Power System Three-Phase Short Circuits01:21

Power System Three-Phase Short Circuits

Determining the subtransient fault current in a power system involves representing transformers by their leakage reactances, transmission lines by their equivalent series reactances, and synchronous machines as constant voltage sources behind their subtransient reactances. In this analysis, certain elements are excluded, such as winding resistances, series resistances, shunt admittances, delta-Y phase shifts, armature resistance, saturation, saliency, non-rotating impedance loads, and small...
Ampere-Maxwell's Law: Problem-Solving01:17

Ampere-Maxwell's Law: Problem-Solving

A parallel-plate capacitor with capacitance C, whose plates have area A and separation distance d, is connected to a resistor R and a battery of voltage V. The current starts to flow at t = 0. What is the displacement current between the capacitor plates at time t? From the properties of the capacitor, what is the corresponding real current?
To solve the problem, we can use the equations from the analysis of an RC circuit and Maxwell's version of Ampère's law.
For the first part of the problem,...
Bus Impedance Matrix01:24

Bus Impedance Matrix

Calculating subtransient fault currents for three-phase faults in an N-bus power system involves using the positive-sequence network. When a three-phase short circuit occurs at a specific bus, the analysis uses the superposition method to evaluate two separate circuits.
In the first circuit, all machine voltage sources are short-circuited, leaving only the prefault voltage source at the fault location. The positive-sequence bus impedance matrix can be determined by solving the nodal equations,...
Three-Phase Short Circuit—Unloaded Synchronous Machine01:21

Three-Phase Short Circuit—Unloaded Synchronous Machine

Conducting a three-phase short circuit test on an unloaded synchronous machine helps understand its impact on the system. The AC fault current's oscillogram, with the DC offset removed, reveals that the waveform amplitude decreases from an initially high value to a steady-state level for one phase of the machine.
This behavior occurs due to the magnetic flux produced by the short-circuit armature currents. Initially, these currents follow high-reluctance paths but eventually shift to...
Insulation Coordination01:23

Insulation Coordination

Insulation coordination is the process of matching electric equipment's insulation strength with protective device characteristics to protect the equipment against expected overvoltages. This selection is based on engineering judgment and cost. Equipment can generally withstand short-duration high transient overvoltages, but repeated tests with identical waveforms can yield inconsistent results. As a result, standard impulse voltage waveforms are used for testing, defined by specific times for...
Electrochemical Systems01:24

Electrochemical Systems

Electrochemical systems provide a fascinating insight into the dynamic interplay of charged species within various phases. One notable example is the interaction between a membrane permeable to K⁺ ions but not to Cl⁻ ions, separating an aqueous KCl solution from pure water. As K⁺ ions diffuse through the membrane, they generate net charges on each phase, leading to a potential difference between them.Similarly, when a piece of Zn is immersed in an aqueous ZnSO₄ solution, the Zn metal, composed...