Development of a variable ground pressure tracked chassis for soil compaction mitigation
Peichen Chu1, Zhao Ding2, Zhan Su2
1School of Agricultural Engineering, Jiangsu University, Zhenjiang, China.
Abstract:
Traditional tracked agricultural machinery with a fixed contact geometry struggles to balance high maneuverability on hard pavements and low soil compaction in soft paddies. To solve this problem, this paper proposes an active variable ground pressure tracked chassis system. The effective ground contact length of the track is adjusted by distributed electric cylinders and a multi-stage linkage mechanism. To evaluate its performance, we conducted kinematic modeling, finite element analysis (FEA), and field tests. First, a planar kinematic model was established to describe the relationship between the cylinder stroke and the track geometry. Second, an internal load transfer path method was used in the FEA post-processing to reduce numerical errors from the track lugs, showing that the low-pressure mode reduces the mean compressive stress from 0.03 MPa to 0.008 MPa. Finally, soil bin tests with a physical prototype were carried out. The results indicate that the low-pressure mode decreases the peak subsoil stress from 93 kPa to 63 kPa at low speeds. In contrast, the regular mode with a shorter track length on hard surfaces reduces steering resistance. This study provides a practical design method for adaptable agricultural tracked vehicles.
Related Concept Videos
Rolling Resistance
For instance, imagine a hard cylinder rolling on a comparatively soft surface. The cylinder's weight compresses the surface beneath it. As the cylinder moves, the material in front of it slows down due to...
Taping Over Different Ground Profiles
Compacting Factor test
The procedure begins by placing concrete into the upper hopper without any compaction. Once filled, the bottom door of this hopper is opened,...
Pumped Concrete
For direct-acting pumps, the concrete enters the pump via the inlet valve under the action of gravity and suction created by the movement of the piston. This concrete is then forced into the pipeline and out through the outlet valve by the forward movement...
Design Example: Maintaining Level of an Embankment
Design Example: Managing Concrete Workability
To address...


