A method of gap and field size determination for abutting a treatment field to a previously treated area

R A Price1, K M Ayyangar

  • 1Department of Radiation Therapy, Medical College of Ohio, Toledo 43699, USA.

Related Concept Videos

Taping Over Different Ground Profiles01:12

Taping Over Different Ground Profiles

Taping over varying ground profiles requires careful adaptation to achieve accurate measurements. On smooth, level ground with minimal vegetation, the tape can rest directly on the ground. Here, the taping team, typically consisting of a head and a rear tapeman, coordinates their positions with clear communication. The rear tapeman holds the tape at the starting point and guides the head tapeman toward a range pole placed beyond the endpoint, using hand or voice signals to ensure alignment.On...
Adjusting a Traverse01:12

Adjusting a Traverse

In the site survey of a four-sided traverse, internal angles are essential to ensure geometric accuracy. The survey revealed that the sum of the measured internal angles was 359 degrees and 48 minutes, which is 12 minutes less than the expected 360 degrees. This discrepancy signals an error likely arising from measurement inaccuracies during the fieldwork.To rectify this error, the adjustment process involved distributing the 12-minute shortfall equally across the four internal angles. By...
Areas Within Irregular Boundaries01:26

Areas Within Irregular Boundaries

Calculating areas within irregular boundaries, such as along rivers or curved roads, is crucial in various fields, including surveying, engineering, and environmental management. Surveyors often begin by creating a traverse, a connected series of straight lines approximating the area's boundary. The coordinates of each traverse point are essential for calculating the enclosed area. The double meridian distance formula is a widely used technique for this purpose. This method utilizes the...
Design Example: Marking Boundaries of a Site Using a Compass01:12

Design Example: Marking Boundaries of a Site Using a Compass

Marking site boundaries using a compass is a precise surveying technique that ensures the accuracy of boundary delineation. The process begins by using provided site details, including the bearings and lengths of each boundary line. The initial step involves calculating latitudes and departures for all sides of the site. This computation verifies that the traverse is free of errors, ensuring a closed and accurate boundary.The process starts at a known point, such as Point A, which is often...