, (EVM) (BIM)

Sara M Elseufy1, Ayman Hussein2, Mohamed Badawy2

  • 1Structural Engineering Department, Faculty of Engineering, Ain Shams University, Cairo, Egypt. Sara.elseufy2292@outlook.com.

Scientific reports
|February 14, 2026
PubMed
まとめ

ビルディング・インフォメーション・モデリング (BIM) は,橋の建設における再作業を大幅に削減し,70-85%の大幅な時間節約と65-75%のコスト削減につながります. これにより,プロジェクトのスケジュールとコストパフォーマンスが向上します.

関連する概念動画

Design Example: Strain Gauge Bridge or Wheatstone Bridge01:15

Design Example: Strain Gauge Bridge or Wheatstone Bridge

The utilization of strain gauges as transducers for converting mechanical strain into electrical signals is a common practice in various engineering applications. These strain gauges are frequently integrated into Wheatstone bridge circuits to accurately measure parameters such as force or pressure. Within this context, each element within the circuit exhibits a resistance that undergoes subtle variations when subjected to mechanical strain. The primary objective is to convert minuscule...
1.1K
Wheatstone Bridge01:29

Wheatstone Bridge

An ohmmeter is a resistance-measuring device. It works by applying a voltage to a resistor of unknown resistance and measuring the current across the resistor. The resistance value is deduced using Ohm's law. Usually, the standard configuration of an ohmmeter comprises a voltmeter or an ammeter. However, such configurations are limited in accuracy because the meters alter the voltage applied to the resistor and the current that flows through it.
Thus, for accurate resistance measurements, a...
1.3K
Bridge rectifier01:24

Bridge rectifier

The bridge rectifier is essential in electronics for efficiently converting alternating current (AC) to direct current (DC). Comprised of four diodes configured in a bridge layout, this rectifier effectively processes both the positive and negative halves of the AC waveform, making it superior to half-wave and full-wave center-tapped rectifiers in terms of voltage regulation and output stability.
Operationally, the bridge rectifier allows current flow through two of its diodes during each...
1.6K
Fischer Projections02:18

Fischer Projections

Learning to draw Fischer projections of molecules and understanding their relevance plays a crucial role in the visual depiction of organic molecules. A Fischer projection is a two-dimensional projection on a planar surface to simplify the three-dimensional wedge–dash representation of molecules. This is especially helpful in the case of molecules with multiple chiral centers that can be difficult to draw. Here, all the bonds of interest are represented as horizontal or vertical lines. While...
16.7K
Cross-bridge Cycle01:26

Cross-bridge Cycle

As muscle contracts, the overlap between the thin and thick filaments increases, decreasing the length of the sarcomere—the contractile unit of the muscle—using energy in the form of ATP. At the molecular level, this is a cyclic, multistep process that involves binding and hydrolysis of ATP, and movement of actin by myosin.
123.1K
Newman Projections02:06

Newman Projections

Different notations are used to represent the three-dimensional structure of molecules on two-dimensional surfaces. One of the most commonly used representations is the dash-wedge formula. The dashed wedges, solid wedges, and the plane lines indicate the groups situated behind the plane, coming out of the plane, and in the plane, respectively.
The organic molecules rotate across the single bonds leading to numerous temporary three-dimensional structures of varying energy known as...
21.7K