,PROM

Maria Zerlik1, Ian-C Jung1, Katharina Schuler1

  • 1Institute for Medical Informatics and Biometry, Faculty of Medicine Carl Gustav Carus, Technische Universität Dresden, Germany.

概括

微型设计模式有助于为患者报告结果测量 (PROM) 可视化提供联合设计研讨会. 虽然它们有帮助,但它们需要更好的介绍和实际指导,以改善处理.

相关概念视频

Design Example01:23

Design Example

The innovation of touch-tone telephony revolutionized the telecommunications industry by replacing the traditional rotary dial with a dual-tone multi-frequency (DTMF) signaling system. This system uses a matrix-style keypad with buttons arranged in four rows and three columns, creating 12 distinct signals each assigned to a pair of frequencies. Each button press results in a simultaneous generation of two sinusoidal tones – one from a low-frequency group (697 to 941 Hz) and one from a...
309
Design Consideration01:22

Design Consideration

Designing a structure involves a series of considerations, primarily the material's ultimate strength, calculated through tests that measure changes under increased force until the material reaches its breaking point or limit. The ultimate load, where the material breaks, is divided by its original cross-sectional area, resulting in the ultimate normal stress or strength. The ultimate shearing stress is another significant factor taken into account.
The factor of safety is another key...
165
Design Example: Setting a Curve Using Design Data01:09

Design Example: Setting a Curve Using Design Data

Designing and plotting a curve using field data requires precise calculations and execution. A horizontal curve with a radius of 200 meters and an intersection angle of 20 degrees is established using the method of perpendicular offsets from the long chord. The long chord, which spans between the curve's endpoints, is calculated to be 69.46 meters in length. To maintain accuracy in plotting, intervals of 3 meters are selected along the chord.The engineer determines the offset distances for each...
15
Design Example: Managing Concrete Workability01:14

Design Example: Managing Concrete Workability

This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
65
Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
31
Group Design02:01

Group Design

The most basic experimental design involves two groups: the experimental group and the control group. The two groups are designed to be the same except for one difference— experimental manipulation. The experimental group gets the experimental manipulation—that is, the treatment or variable being tested—and the control group does not. Since experimental manipulation is the only difference between the experimental and control groups, we can be sure that any differences between...
8.8K