Foundation fieldbus economics comparison
1Syncrude Canada Ltd., Fort McMurray, Alberta. verhappen.ian@syncrude.com
Abstract:
This paper will provide a life cycle cost comparison between installations of three different control system configurations. 1. Conventional analogue instruments. 2. HART protocol instruments with a parallel asset management system. 3. Foundation fieldbus installation. Engineering, procurement, construction, commissioning and ongoing maintenance costs will be included as part of the analysis. Data for the analysis includes equipment from multiple manufacturers so a range of expected expenses will also be provided to indicate the sensitivity of the economic calculations to supplier. All calculations will be based on the median equipment values.
Related Concept Videos
Bus Impedance Matrix
In the first circuit, all machine voltage sources are short-circuited, leaving only the prefault voltage source at the fault location. The positive-sequence bus impedance matrix can be determined by solving the nodal equations,...
PI Controller: Design
Field Effect Transistor
Control Systems: Applications
In modern vehicles, control systems manage various functions to enhance performance and safety. The steering wheel and accelerator are primary inputs in a car's control system. The direction...
Biasing of FET
In an N-channel JFET, the structure consists of N-type material forming the channel on a P-type substrate, with the gate...
Instrument Transformers