Related Experiment Videos
Process management in computed tomography: using critical pathway method to design and improve work flow in computed
U K Teichgräber1, F Neumann, J Boeck
1Department of Radiology, Humboldt University, Berlin, Germany.
European Radiology
|September 23, 2000
Summary
No abstract available in PubMed .
Related Concept Videos
Articles linked to this work by shared authors, journal, and citation graph.
Mobile computed tomography at the Munich Oktoberfest : From idea to implementation.
Radiologie (Heidelberg, Germany)·2024
[Imaging of neuroendocrine tumors of the gastrointestinal tract : Value of (hybrid) imaging diagnostics in radiology].
Radiologie (Heidelberg, Germany)·2024
Diagnostic accuracy of SSR-PET/CT compared to histopathology in the identification of liver metastases from well-differentiated neuroendocrine tumors.
Cancer imaging : the official publication of the International Cancer Imaging Society·2023
Perifocal Edema in Patients with Meningioma is Associated with Impaired Whole-Brain Connectivity as Detected by Resting-State fMRI.
AJNR. American journal of neuroradiology·2023
TENSO: Software Package for Numerically Exact Open Quantum Dynamics Based on Efficient Tree Tensor Network Decomposition of the Hierarchical Equations of Motion.
Journal of chemical theory and computation·2026
Evaluating the Performance of the TOP100 Tool in Detecting Key Small Bowel Findings at Capsule Endoscopy.
Diagnostics (Basel, Switzerland)·2026
A high throughput platform for measuring and predicting vitrification behavior in multicomponent aqueous solutions.
bioRxiv : the preprint server for biology·2026
Distributed majority consensus in synthetic microbial consortia with bursty gene expression.
Mathematical biosciences·2026
Harnessing CRISPRi Competition to Develop Multimodule Controllers for Resource-Aware Circuit Design.
Methods in molecular biology (Clifton, N.J.)·2026