Keeping track of the distance from home by leaky integration along veering paths

Markus Lappe1, Maren Stiels, Harald Frenz

  • 1Institute of Psychology, University of Muenster, 48149 Münster, Germany. mlappe@uni-muenster.de

Related Concept Videos

Distance Problem01:29

Distance Problem

When an object's velocity changes over time, the total distance traveled can be determined by summing small displacement intervals over short increments. This approach approximates the true distance through numerical summation and the use of integral calculus. An estimate of the total displacement can be obtained by measuring velocity at regular intervals and multiplying each value by the corresponding time step.If a runner accelerates over the first three seconds of a race, speed measurements...
Design Example: Measuring Distance Between Two Points with Obstructions01:10

Design Example: Measuring Distance Between Two Points with Obstructions

When measuring distances in areas with physical obstructions, such as a lake in a field, surveyors must employ techniques to calculate accurate lengths without direct line measurements. One effective method is the offset technique, which allows for precise distance estimation over inaccessible stretches.In this scenario, a surveyor must measure a side of an area that crosses a lake. Since the measuring tape cannot span the lake, the surveyor begins by establishing a baseline that aligns with...
Distance Measurements by Taping01:18

Distance Measurements by Taping

Tapes are essential in surveying for accurate, durable, and short-distance measurements. Made from lightweight, nylon-coated steel, they offer flexibility and strength for rugged outdoor use. The nylon coating protects against rust and wear, extending the tape's life. Standard lengths, around 30 meters, are marked in meters and millimeters for precision.Surveyors select tapes based on site conditions and accuracy needs. Lightweight, nylon-coated tapes are commonly used for ease of handling and...
Interference: Path Lengths01:10

Interference: Path Lengths

Consider two sources of sound, that may or may not be in phase, emitting waves at a single frequency, and consider the frequencies to be the same.
Two special sources may be considered when they are in phase. This can be easily achieved by feeding the two sources from the same source. An example would be synchronizing the two speakers by feeding them with the same source, such as the sound waves produced by a tuning fork. This setup ensures that the two sources have the same frequency and are...
Area Between Curves: Integrating With Respect to x01:25

Area Between Curves: Integrating With Respect to x

Consider two continuous functions defined on a closed interval from a to b. The region between these curves is bounded vertically by their graphs and horizontally by the endpoints of the interval. The objective is to measure the area of this region.An initial estimate of the area can be obtained by dividing the interval into a large number of narrow vertical strips of equal width. Each strip is approximated by a rectangle whose height is given by the vertical difference between the two...
Trapezoidal Rule01:26

Trapezoidal Rule

Estimating the distance traveled by a vehicle using its recorded velocity over time is a common problem in physics and engineering. When velocity data is available at discrete time intervals, rather than as a continuous function, numerical integration methods such as the trapezoidal rule are often employed to approximate the total displacement.The trapezoidal rule works by dividing the total time interval into several equal segments. Within each segment, the recorded velocities at the endpoints...