[Purveyors of technology: provincial engineers and the construction of road infrastructure in Minas Gerais]
1Núcleo de Pesquisa em História Econômica e Demográfica do Centro de Desenvolvimento e Planejamento Regional de Minas Gerais, Universidade Federal de Minas Gerais, Belo Horizonte, MG, Brasil. lidiany@cedeplar.ufmg.br
Abstract:
The article analyzes the role played by engineers in the construction of road infrastructure in Minas Gerais between the 1840s and 1880s. Building and providing regular maintenance for roads and bridges was a task carried out by the Minas Gerais provincial government, which since the 1830s had a specific agency assigned to designing, building, and maintaining public communication routes. Engineers were part of the agency from its inception, playing a significant role in designing projects and in the actual execution of certain works. The current study is grounded in administrative documentation in which the details of work progress are reported to the provincial government. The gathered records provide technical, administrative, and financial information, along with data on labor power and the agents engaged in construction works.
Related Concept Videos
Manufacture of Concrete Masonry Units
These wet blocks are then transported for curing, which can occur in one of two environments: a...
Design Example: Alignment of a Road Line Using GIS
Semiconductors
Metals such as copper (Cu), zinc (Zn), or lead (Pb) have low resistivity and feature conduction bands that are either not fully occupied or overlap with the valence band, making a bandgap non-existent. This allows electrons in the highest energy levels of the valence band to easily transition to the conduction band upon gaining...
Quarrying of Stone
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the block.
Masonry Paving
Minerals