Related Experiment Video
Updated: Aug 11, 2026

Non-Invasive Compression-Induced Anterior Cruciate Ligament (ACL) Injury and In Vivo Imaging of Protease Activity in Mice
Published on: September 29, 2023
"Empty wall" and "vertical strut" signs of ACL insufficiency
1Department of Orthopedic Surgery, Rush-Presbyterian-St. Luke's Medical Center, Chicago, IL 60612.
Abstract:
We report our observation on the "empty wall" and "vertical strut" signs of anterior cruciate ligament (ACL) insufficiency. ACL tears most commonly occur in the midsubstance; arthroscopic evaluation of patients with these tears often reveals minimal evidence of previous ACL tissue along the intercondylar wall, thus giving the appearance of an "empty wall." In proximal ACL tears, the long remnant of ACL tissue may adhere to adjacent PCL tissue. Arthroscopically, one may see this vertically oriented strut of tissue, which to the casual arthroscopist may mimic a normal-appearing ACL except for orientation and tension. In addition, the "empty wall" sign will be noted because the lateral intercondylar wall becomes easily visible following ACL injury. In two separate prospective studies of 84 such patients, the combined incidence of the empty wall sign was 82%, and the incidence of the vertical strut sign was 50%. These findings should be sought for meticulously at the time of arthroscopic evaluation. The vertical strut should not be misinterpreted as an aberrantly oriented ACL or partial ACL tear.
More Related Videos
05:07Early Weight-Bearing Rehabilitation Protocol After Anterior Cruciate Ligament Reconstruction
Published on: March 1, 2024
06:28Anterior Cruciate Ligament Transection and Synovial Fluid Lavage in a Rodent Model to Study Joint Inflammation and Posttraumatic Osteoarthritis
Published on: September 2, 2025
Related Concept Videos
Method of Sections: Problem Solving II
Posttensioned Masonry Walls
Post-tensioned masonry walls use high-strength steel rods or flexible tendons to enhance the strength and efficiency of masonry structures. These elements are securely anchored to the foundation and extend vertically either within the cores of the masonry units or between the masonry wythes. The construction process involves building the wall with these tensioning elements in place and allowing the mortar to fully cure.
Following the curing process, the tensioning begins. Steel rods are...