Providing Limited Local Electric Service During a Major Grid Outage: A First Assessment Based on Customer Willingness

Sunhee Baik1, M Granger Morgan1, Alexander L Davis1

  • 1Department of Engineering and Public Policy, Carnegie Mellon University, Pittsburgh, PA, USA.

Related Concept Videos

Secondary Distribution01:25

Secondary Distribution

Secondary distribution systems provide electrical energy at the utilization voltage levels from distribution transformers to customer meters. Typical secondary voltages in the United States include 120/240 V for residential use, 208Y/120 V for residential and commercial use, and 480Y/277 V for industrial and high-rise commercial use.
In residential areas, 120/240 V single-phase, three-wire service is commonly used for lighting, outlets, and large appliances. Urban areas with high-density loads...
603
Primary Distribution01:28

Primary Distribution

Primary distribution systems deliver electrical power from substations to consumers through various voltage classes, with 15-kV class voltages being predominant among U.S. utilities. Older 2.5- and 5-kV classes are being replaced by 15-kV primaries, while higher 25- to 34.5-kV classes are used in high-density urban areas and rural regions with long feeders. Three-phase, four-wire multigrounded systems are widely employed for balanced power delivery, using the neutral wire as a grounding point.
588
Distribution Reliability and Automation01:25

Distribution Reliability and Automation

Distribution reliability in electrical power systems is critical for ensuring an uninterrupted power supply to consumers at minimal cost. According to IEEE Standard Terms, reliability is the probability that a device will function without failure over a specified time period or amount of usage. For electric power distribution, this translates to maintaining continuous power supply and addressing customer concerns over power outages. Several indices, as defined by IEEE Standard 1366-2012, are...
542
Maximum Power Flow and Line Loadability01:23

Maximum Power Flow and Line Loadability

The maximum power flow for lossy transmission lines is derived using ABCD parameters in phasor form. These parameters create a matrix relationship between the sending-end and receiving-end voltages and currents, allowing the determination of the receiving-end current. This relationship facilitates calculating the complex power delivered to the receiving end, from which real and reactive power components are derived.
653
Load-frequency control01:28

Load-frequency control

Load-frequency control (LFC) is vital for maintaining power system stability, ensuring that frequency and power flows remain within acceptable limits during load changes. Turbine-governor control eliminates rotor accelerations and decelerations following load changes. However, a steady-state frequency error persists when the change in the turbine-governor reference setting is zero. In an interconnected power system, each area agrees to export or import a scheduled amount of power through...
700
Power System Three-Phase Short Circuits01:21

Power System Three-Phase Short Circuits

Determining the subtransient fault current in a power system involves representing transformers by their leakage reactances, transmission lines by their equivalent series reactances, and synchronous machines as constant voltage sources behind their subtransient reactances. In this analysis, certain elements are excluded, such as winding resistances, series resistances, shunt admittances, delta-Y phase shifts, armature resistance, saturation, saliency, non-rotating impedance loads, and small...
594