Related Experiment Video
Updated: Feb 13, 2026

A Novel Method for Involving Women of Color at High Risk for Preterm Birth in Research Priority Setting
Published on: January 12, 2018
Labor estimation by informational objective assessment (LEIOA) for preterm delivery prediction
Iker Malaina1, Larraitz Aranburu2, Luis Martínez3
1Department of Mathematics, University of the Basque Country UPV/EHU, Barrio Sarriena, s/n, 48940, Leioa, Spain. iker.malaina@ehu.eus.
Purpose:
To introduce LEIOA, a new screening method to forecast which patients admitted to the hospital because of suspected threatened premature delivery will give birth in < 7 days, so that it can be used to assist in the prognosis and treatment jointly with other clinical tools.
Methods:
From 2010 to 2013, 286 tocographies from women with gestational ages comprehended between 24 and 37 weeks were collected and studied. Then, we developed a new predictive model based on uterine contractions which combine the Generalized Hurst Exponent and the Approximate Entropy by logistic regression (LEIOA model). We compared it with a model using exclusively obstetric variables, and afterwards, we joined both to evaluate the gain. Finally, a cross validation was performed.
Results:
The combination of LEIOA with the medical model resulted in an increase (in average) of predictive values of 12% with respect to the medical model alone, giving a sensitivity of 0.937, a specificity of 0.747, a positive predictive value of 0.907 and a negative predictive value of 0.819. Besides, adding LEIOA reduced the percentage of incorrectly classified cases by the medical model by almost 50%.
Conclusions:
Due to the significant increase in predictive parameters and the reduction of incorrectly classified cases when LEIOA was combined with the medical variables, we conclude that it could be a very useful tool to improve the estimation of the immediacy of preterm delivery.
Related Concept Videos
Predicting Molecular Geometry
What are Estimates?
The estimate for the mean of a sample is denoted by ͞x, whereas the mean of the population is designated as μ. Further, parameters such...
Velocity of an Object
Prediction Intervals
However, the point estimate is most likely not the exact value of the population parameter, but close to it. After calculating point estimates, we construct interval estimates, called confidence intervals or prediction intervals. This prediction interval comprises a range of values unlike the point estimate and is a better predictor of the observed sample value, y.
Estimation of k and VD of Aminoglycosides
Potential Due to a Polarized Object

