Related Experiment Video
Updated: Nov 3, 2025

Use of Principal Components for Scaling Up Topographic Models to Map Soil Redistribution and Soil Organic Carbon
Published on: October 16, 2018
Check dam storage capacity calculation based on high-resolution topogrammetry: Case study of the Cutou Gully,
Tao Huang1, Mingtao Ding1, Zemin Gao1
1Faculty of Geosciences and Environmental Engineering, Southwest Jiaotong University, Chengdu 611756, China.
Abstract:
Debris flows are a common natural trigger of disasters in mountainous areas, and check dams are standard structural measures for controlling debris flows. Despite their prevalence in debris flow-prone areas worldwide, the capacity of check dams is still calculated using empirical formulas, which lead to large calculation errors. This paper proposes a new method that uses GIS to calculating the design storage capacity of a check dam in the debris flow-prone Cutou Gully in Wenchuan County, China. Large-scale digital surface models derived from unmanned aerial vehicle imagery and ground surveys identify local topographic changes in the debris flow path and develop appropriate maintenance plans for check dams. The measured storage capacity of the check dam is determined by analyzing the DEM differences. This study uses the newly proposed method to calculate the design storage capacity of the check dam. The accuracy of the calculation results was evaluated using the checkpoint method, and the results showed that the design and measured siltation surface errors ranged from -1.16-2.96 m, with a root mean square error of 0.93 m. The design capacity of the check dam is 33.6× 104 m3, and the actual capacity is 36.7× 104 m3, with an absolute error of 3.1× 104 m3 and relative error of 8.6%. The results prove the validity of the proposed calculation method; moreover, this study shows that the new method is accurate, easy to operate, and highly efficient for visualizing the spatial distribution of the siltation depth behind the check dam. This work will help improve future engineering decisions, design strategies, and find optimal design solutions to minimize the risk of debris flow hazards.
Related Concept Videos
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
Design Example: Design of an Irrigation Channel
Design Example: Creating a Hydraulic Model of a Dam Spillway
Design Example: Maintaining Level of an Embankment
Topographic Surveying and Contours
Methods of Obtaining Topography

