Optimal placement of Phasor Measurement Unit considering System Observability Redundancy Index: case study of the
Edwin Otieno Okendo1, Cyrus Wabuge Wekesa2, Michael Juma Saulo3
1Department of Electrical Engineering, Pan African University Institute of Basic Sciences Technology and Innovation (PAUSTI), Kenya.
Abstract:
Modern power systems require advanced monitoring and control, a capability made possible by Phasor Measurement Units (PMUs) aided by synchrophasor technology. Because PMUs have significant costs, it is necessary to optimally place them in an electrical power network. This paper proposes the Optimal PMU Placement (OPP) on the Kenya Power Transmission Network (Nairobi Region 30-bus system) using the existing methods; The Depth-First method, the Mixed Integer Linear Programming (MILP) using intlinprog solver, and the Artificial Bee Colony (ABC) algorithm. The algorithms are first implemented on the IEEE-14 and 30 bus test systems for verification before implementing the Kenya Power Transmission Network (Nairobi Region 30-bus system). Finally, the results for the three methods are compared. A key consideration is the System Observability Redundancy Index (SORI) under normal baseload conditions, with and without the inclusion of Zero Injection Buses (ZIBs). A higher value of SORI increases the measurement redundancy of the PMUs installed at a given bus. This paper further proposes the modelling of ZIB with adjacent buses by considering their Observability Index (OI). The case studies are modelled in Power System Analysis Toolbox (PSAT), and the simulations are carried out in MATLAB. From the simulation results, the ABC algorithm gives the optimal solution with the highest SORI compared to the Depth-First method and MILP, with the exclusion of the ZIB. The Nairobi region 30-bus system require 12 PMUs located at buses; 2, 5, 8, 9, 11, 13, 14, 16, 21, 24, 27 and 29 for complete power system observability with a SORI of 43.
Related Concept Videos
Maximum Power Flow and Line Loadability
Power System Three-Phase Short Circuits
Distribution Reliability and Automation
Bus Impedance Matrix
In the first circuit, all machine voltage sources are short-circuited, leaving only the prefault voltage source at the fault location. The positive-sequence bus impedance matrix can be determined by solving the nodal equations,...
Series Impedances: Three-Phase Line
Using Kirchhoff's laws, an integro-differential equation for the network is derived. This equation accounts for unbalanced phase currents, which may induce return currents through neutral wires and the earth, seeking the least impedance path. Earth return conductors can replace the...
Zones of Protection
Protective zones are defined by closed dashed lines, containing one or more components. A key characteristic of these zones is the strategic placement of...