Optimization of PBFT Algorithm Based on QoS-Aware Trust Service Evaluation

Wei Liu1,2, Xuhao Zhang1, Wenlong Feng1

  • 1School of Information and Communication Engineering, Hainan University, Haikou 570228, China.

Related Concept Videos

Maximum Power Flow and Line Loadability01:23

Maximum Power Flow and Line Loadability

The maximum power flow for lossy transmission lines is derived using ABCD parameters in phasor form. These parameters create a matrix relationship between the sending-end and receiving-end voltages and currents, allowing the determination of the receiving-end current. This relationship facilitates calculating the complex power delivered to the receiving end, from which real and reactive power components are derived.
175
Decision Making: P-value Method01:09

Decision Making: P-value Method

The process of hypothesis testing based on the P-value method includes calculating the P- value using the sample data and interpreting it.
First, a specific claim about the population parameter is proposed. The claim is based on the research question and is stated in a simple form. Further, an opposing statement to the claim  is also stated. These statements can act as null and alternative hypotheses:  a null hypothesis would be a neutral statement while the alternative hypothesis can...
5.6K
Confidence Coefficient01:24

Confidence Coefficient

The confidence coefficient is also known as the confidence level or degree of confidence. It is the percent expression for the probability, 1-α, that the confidence interval contains the true population parameter assuming that the confidence interval is obtained after sufficient unbiased sampling; for example, if the CL = 90%, then in 90 out of 100 samples the interval estimate will enclose the true population parameter. Here α is the area under the curve, distributed equally under...
7.8K
Quality Assurance01:19

Quality Assurance

Quality assurance is the overarching term used to describe the activities employed to ensure the proper performance of a system. These activities can be classified into three categories: quality control, quality assessment, and internal corrective measures. Typically, these activities work cyclically: quality control is performed before and during the analysis, while quality assessment occurs during and after the investigation. Internal corrective measures are implemented based on the findings...
196
BIBO stability of continuous and discrete -time systems01:24

BIBO stability of continuous and discrete -time systems

System stability is a fundamental concept in signal processing, often assessed using convolution. For a system to be considered bounded-input bounded-output (BIBO) stable, any bounded input signal must produce a bounded output signal. A bounded input signal is one where the modulus does not exceed a certain constant at any point in time.
To determine the BIBO stability, the convolution integral is utilized when a bounded continuous-time input is applied to a Linear Time-Invariant (LTI) system....
506
Physiological Pharmacokinetic Models: Incorporating Hepatic Transporter-Mediated Clearance01:07

Physiological Pharmacokinetic Models: Incorporating Hepatic Transporter-Mediated Clearance

Drug transporters are critical in drug absorption, distribution, and excretion processes. They should be included in physiological-based pharmacokinetic (PBPK) models, which help predict human drug disposition. However, predicting this is challenging during drug development, especially when liver transport is involved. However, with a realistic representation of body transport processes, an accurate model may be possible.
A recent model describes pravastatin's hepatobiliary excretion,...
78