Abstract:
Road project sites are dangerous and crash-prone, with many hazards that can cause injuries and can result in the deaths of road users or site-workers. Work zones for road construction or maintenance can potentially contribute to increasing these crashes. Many studies have addressed this issue; however, there is a lack of similar studies in Saudi Arabia. Therefore, this study contributes to developing safety practices for road work zones in Saudi Arabia by identifying, analyzing, and controlling the main risk factors. A survey approach was used to identify risk factors and potential countermeasures from road users' and civil engineering experts' perceptions. The main findings showed that most participants believed that the presence of work zones on the road might increase the probability of crash occurrence and that the highest risk factor that could cause a crash in a work zone is related to driver behavior. Both groups agreed that strict action against contractors or consultants who have safety violations would enhance road safety in work zones. Considering the findings of this study, decision-makers should take strong action to implement and improve road safety practices.
Related Concept Videos
Survey Safety
Design Example: Managing Concrete Workability
Design Example: Alignment of a Road Line Using GIS
Masonry in Cold and Hot Weather Conditions
Other key practices include keeping masonry units...
Quarrying of Stone
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
Preplaced Aggregate Concrete