Jove
Visualize
Contact Us
JoVE
x logofacebook logolinkedin logoyoutube logo
ABOUT JoVE
OverviewLeadershipBlogJoVE Help Center
AUTHORS
Publishing ProcessEditorial BoardScope & PoliciesPeer ReviewFAQSubmit
LIBRARIANS
TestimonialsSubscriptionsAccessResourcesLibrary Advisory BoardFAQ
RESEARCH
JoVE JournalMethods CollectionsJoVE Encyclopedia of ExperimentsArchive
EDUCATION
JoVE CoreJoVE BusinessJoVE Science EducationJoVE Lab ManualFaculty Resource CenterFaculty Site
Terms & Conditions of Use
Privacy Policy
Policies

Related Concept Videos

Design Example: Alignment of a Road Line Using GIS01:17

Design Example: Alignment of a Road Line Using GIS

97
The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
97
Manipulation and Analysis01:21

Manipulation and Analysis

53
GIS manipulation and analysis functions are vital for decision-making and planning. These activities range from data retrieval tasks, such as selecting information based on specific criteria, to advanced analytical techniques that address complex spatial problems.One critical GIS analysis method is overlaying, which combines multiple data layers to examine impacts. For example, overlaying a river-dammed lake boundary with road networks can identify affected infrastructure. Another common...
53
Introduction to Vertical Curves01:24

Introduction to Vertical Curves

136
Vertical curves are parabolic transitions that connect different grades on highways and railroads, ensuring a smooth alignment between back and forward tangents. The back tangent represents the initial grade, while the forward tangent defines the subsequent grade. These curves can be symmetrical, with equal tangent lengths, or nonsymmetrical, with varying lengths. The key points defining a vertical curve include the Point of Vertical Intersection (P.V.I.), where the tangents meet; the Point of...
136
Design Example: Traverse Angle Computations01:25

Design Example: Traverse Angle Computations

128
Traverse angle computations are a critical component of surveying, used to compute the internal angles within a closed traverse. A traverse consists of a series of connected lines forming a closed loop, often used for land boundary delineation or mapping. Calculating the internal angles ensures accuracy in the traverse geometry and is essential for checking survey data integrity.The process begins with known azimuths and bearings of the traverse sides. Internal angles at each vertex are...
128
Introduction to Horizontal Curves01:19

Introduction to Horizontal Curves

190
Horizontal curves are essential in highway and railroad design, ensuring smooth and safe transitions between straight path segments, or tangents. These curves allow vehicles to maintain speed without abrupt changes, minimizing accidents and improving travel efficiency.A horizontal curve is typically defined by its geometric relationship to two tangents that meet at an intersection point (P.I.), where a simple curve is introduced to connect them. The back tangent refers to the initial tangent...
190
Design Example: Setting a Curve Using Design Data01:09

Design Example: Setting a Curve Using Design Data

66
Designing and plotting a curve using field data requires precise calculations and execution. A horizontal curve with a radius of 200 meters and an intersection angle of 20 degrees is established using the method of perpendicular offsets from the long chord. The long chord, which spans between the curve's endpoints, is calculated to be 69.46 meters in length. To maintain accuracy in plotting, intervals of 3 meters are selected along the chord.The engineer determines the offset distances for each...
66

You might also read

Related Articles

Articles linked to this work by shared authors, journal, and citation graph.

Sort by
Same author

Virtual Traffic Light Implementation on a Roadside Unit over 802.11p Wireless Access in Vehicular Environments.

Sensors (Basel, Switzerland)·2022
Same author

Integration with 3D Visualization and IoT-Based Sensors for Real-Time Structural Health Monitoring.

Sensors (Basel, Switzerland)·2021
See all related articles

Related Experiment Video

Updated: Aug 25, 2025

Evaluation of an Exclusive Spur Dike U-Turn Design with Radar-Collected Data and Simulation
11:41

Evaluation of an Exclusive Spur Dike U-Turn Design with Radar-Collected Data and Simulation

Published on: February 1, 2020

20.5K

Turning Movement Count Data Integration Methods for Intersection Analysis and Traffic Signal Design.

Mohammad Shokrolah Shirazi1, Hung-Fu Chang1, Shahab Tayeb2

  • 1R.B. Annis School of Engineering, University of Indianapolis, Indianapolis, IN 46227, USA.

Sensors (Basel, Switzerland)
|October 14, 2022
PubMed
Summary

Realistic traffic simulations require actual turning movement count (TMC) data. Using route-based vehicle injection in SUMO (Simulation of Urban MObility) improves traffic signal design and reduces travel time.

Keywords:
SUMOintersection analysisintersection simulationturning movement countvision-based tracking system

More Related Videos

Evaluating the Effect of Roadside Parking on a Dual-Direction Urban Street
14:55

Evaluating the Effect of Roadside Parking on a Dual-Direction Urban Street

Published on: January 20, 2023

3.4K
Trajectory Data Analyses for Pedestrian Space-time Activity Study
16:14

Trajectory Data Analyses for Pedestrian Space-time Activity Study

Published on: February 25, 2013

13.6K

Related Experiment Videos

Last Updated: Aug 25, 2025

Evaluation of an Exclusive Spur Dike U-Turn Design with Radar-Collected Data and Simulation
11:41

Evaluation of an Exclusive Spur Dike U-Turn Design with Radar-Collected Data and Simulation

Published on: February 1, 2020

20.5K
Evaluating the Effect of Roadside Parking on a Dual-Direction Urban Street
14:55

Evaluating the Effect of Roadside Parking on a Dual-Direction Urban Street

Published on: January 20, 2023

3.4K
Trajectory Data Analyses for Pedestrian Space-time Activity Study
16:14

Trajectory Data Analyses for Pedestrian Space-time Activity Study

Published on: February 25, 2013

13.6K

Area of Science:

  • Transportation Engineering
  • Traffic Flow Theory
  • Urban Planning

Background:

  • Current traffic simulations often use unrealistic random vehicle data, hindering accurate intersection analysis.
  • Actual turning movement count (TMC) data is crucial for realistic traffic modeling and planning.

Purpose of the Study:

  • To present and compare two methods for incorporating actual TMC data into traffic simulations.
  • To improve the accuracy of intersection simulation and traffic signal design using real-world data.

Main Methods:

  • Developed a vision-based tracking system to estimate TMC for three Las Vegas intersections.
  • Incorporated estimated TMC data into the Simulation of Urban MObility (SUMO) software.
  • Utilized route-based vehicle injection, considering frame-level departure times, for simulation.

Main Results:

  • Route-based vehicle injection significantly improves simulation realism compared to random data.
  • Analysis of traffic measurements like travel time, density, and waiting time revealed critical intersection edges.
  • t-tests with a 95% confidence interval confirmed the importance of the route-based method.

Conclusions:

  • Actual TMC data and route-based simulation methods are essential for accurate traffic analysis and intersection modeling.
  • New traffic signal designs based on critical turning movements can improve traffic flow and reduce travel times.
  • This approach enhances the ability to accommodate actual traffic demand effectively.