Impact of ground surface subsidence caused by underground coal mining on natural gas pipeline

Oleg Bazaluk1, Oleksandr Kuchyn2, Pavlo Saik1,3

  • 1Belt and Road Initiative Center for Chinese-European Studies (BRICCES), Guangdong University of Petrochemical Technology, Maoming, 525000, China.

Scientific Reports
|November 7, 2023
PubMed

Related Concept Videos

Multiple Pipe Systems01:21

Multiple Pipe Systems

Multipipe systems consist of complex configurations of interconnected pipes designed to transport fluids efficiently across intricate networks. They are essential in engineering applications requiring precise control over flow distribution, pressure, and head loss. They are categorized into series, parallel, loop, and network configurations, each distinguished by unique flow characteristics and applications.
Series Configuration
In a series configuration, fluid flows sequentially from one pipe...
768
Pumped Concrete01:13

Pumped Concrete

Concrete in large quantities can be pumped across long distances for placing in inaccessible sites. This system comprises a hopper that receives concrete from a mixer, a pump to propel the concrete, and pipelines that facilitate its delivery.
For direct-acting pumps, the concrete enters the pump via the inlet valve under the action of gravity and suction created by the movement of the piston. This concrete is then forced into the pipeline and out through the outlet valve by the forward movement...
79
Carbonation Shrinkage01:24

Carbonation Shrinkage

Atmospheric CO2 penetrates the concrete's pores and, in the presence of moisture, forms carbonic acid, which then reacts with calcium hydroxide in the hydrated cement, forming calcium carbonate. This process reduces the concrete's volume and is termed carbonation shrinkage.
The concrete's permeability is slightly reduced as calcium carbonate produced during the reaction fills its pores. Furthermore, its strength is slightly enhanced as the water released during the reaction...
147
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
72
Taping Over Different Ground Profiles01:12

Taping Over Different Ground Profiles

Taping over varying ground profiles requires careful adaptation to achieve accurate measurements. On smooth, level ground with minimal vegetation, the tape can rest directly on the ground. Here, the taping team, typically consisting of a head and a rear tapeman, coordinates their positions with clear communication. The rear tapeman holds the tape at the starting point and guides the head tapeman toward a range pole placed beyond the endpoint, using hand or voice signals to ensure alignment.On...
28
Shrinkage in Concrete01:27

Shrinkage in Concrete

Shrinkage in concrete is primarily due to water loss from evaporation, hydration of cement, or carbonation, leading to a reduction in volume. The volumetric contraction results in volumetric strain in concrete. However, in practice, shrinkage is measured as linear strain, which is one-third of the volumetric strain.
When concrete is still in its plastic state, it can undergo a decrease in volume by about 1% of its absolute volume. This decrease is known as plastic shrinkage. It arises either...
107