Estimating the loss of economic predictability from aggregating firm-level production networks
Christian Diem1,2, András Borsos1,3,4, Tobias Reisch1,5
1Complexity Science Hub Vienna, Vienna A-1080, Austria.
Abstract:
To estimate the reaction of economies to political interventions or external disturbances, input-output (IO) tables-constructed by aggregating data into industrial sectors-are extensively used. However, economic growth, robustness, and resilience crucially depend on the detailed structure of nonaggregated firm-level production networks (FPNs). Due to nonavailability of data, little is known about how much aggregated sector-based and detailed firm-level-based model predictions differ. Using a nearly complete nationwide FPN, containing 243,399 Hungarian firms with 1,104,141 supplier-buyer relations, we self-consistently compare production losses on the aggregated industry-level production network (IPN) and the granular FPN. For this, we model the propagation of shocks of the same size on both, the IPN and FPN, where the latter captures relevant heterogeneities within industries. In a COVID-19 inspired scenario, we model the shock based on detailed firm-level data during the early pandemic. We find that using IPNs instead of FPNs leads to an underestimation of economic losses of up to 37%, demonstrating a natural limitation of industry-level IO models in predicting economic outcomes. We ascribe the large discrepancy to the significant heterogeneity of firms within industries: we find that firms within one sector only sell 23.5% to and buy 19.3% from the same industries on average, emphasizing the strong limitations of industrial sectors for representing the firms they include. Similar error levels are expected when estimating economic growth, CO2 emissions, and the impact of policy interventions with industry-level IO models. Granular data are key for reasonable predictions of dynamical economic systems.
Related Concept Videos
Prediction Intervals
However, the point estimate is most likely not the exact value of the population parameter, but close to it. After calculating point estimates, we construct interval estimates, called confidence intervals or prediction intervals. This prediction interval comprises a range of values unlike the point estimate and is a better predictor of the observed sample value, y.
Estimation of the Physical Quantities
Production Efficiency
Propagation of Uncertainty from Systematic Error
Propagation of Uncertainty from Random Error
Design Example: Analyzing Capacity Contours for Flood Risk Assessment


