Parameter design and effectiveness evaluation of wide strip mining of extra thick coal seams under dense buildings
Wulin Lei1,2, Lan Yu3, Shangyu Bai3
1School of New Energy, Longdong University, Qingyang, 745000, Gansu, China. xakjdxwl@163.com.
Abstract:
In order to safeguard the surface structures from mining damage while optimizing the liberation of coal resources under the dense surface buildings of the Cedi River coal mine. Considering that the analysis of the structure and type of surface buildings and the geological mining conditions of the mine, a wide strip mining design with a retention width of 70 m and a mining width of 50 m was finally determined by using the pressure arch theory and Wilson's theory, combined with the actual layout of working faces 51,002, 51,004 and 51,006 at the site.The strip mining design is verified by probability integral method and FLAC3D numerical simulation calculation respectively, The findings indicate that the highest value of earth surface subsidence created by the mining of the wide strip is 210 mm, the surface horizontal deformation value is 1.0 to - 1.4 mm/m, the damage to surface buildings is less than Level I, which satisfying the prerequisites of the surface building protection level, and can realize the continuous advancement of mine 51,002, 51,004 and 51,006 working faces, The coal pillars of the retained strip have sufficient support strength and long-term consistency, and the movement and deformation of the overburden after mining will not cause undulating subsidence of the surface, which effectively solve the mine's technical difficulties in safely coal mining under surface buildings.
Related Concept Videos
Design Example: Sustainability in Concrete Building
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground...
Design Example: Managing Concrete Workability
Quarrying of Stone
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
Design Example: Dimensioning of Concrete Masonry Construction
The site engineer has laid out a plan for the storeroom with external dimensions of twelve feet in length and...
Design Example: Analyzing Capacity Contours for Flood Risk Assessment