Practices improvement of building information modeling in the Egyptian construction projects

Yasmin Nabil1, Ahmed H Ibrahim2, Suad Hosny2

  • 1Department of Construction Engineering and Utilities, Faculty of Engineering, Zagazig University, Zagazig, Egypt. yasmin.nabil680@gmail.com.

Scientific Reports
|June 12, 2024
PubMed

Related Concept Videos

Reinforced Brick Masonry01:15

Reinforced Brick Masonry

Reinforced brick masonry is an advanced construction technique that enhances the structural integrity of brick walls by incorporating steel reinforcements. These reinforcements are either placed within the hollow cores of bricks or sandwiched between two layers of masonry, known as wythes, and are then secured in place with grout. Grout is a fluid mixture composed of Portland cement, aggregate, and water, providing the necessary bonding agent for the steel and brick.
To fortify brick walls...
1.1K
Design Example: Sustainability in Concrete Building01:26

Design Example: Sustainability in Concrete Building

As the construction industry moves towards more eco-friendly practices, concrete's adaptability and its ability to incorporate sustainable features make it a key material in the drive towards greener building solutions.
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground...
165
Design Example: Managing Concrete Workability01:14

Design Example: Managing Concrete Workability

This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
80
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
61
Profile Leveling and Cross Sections01:26

Profile Leveling and Cross Sections

Profile leveling and cross-sections are surveying methods used to determine and document terrain elevations for infrastructure projects such as highways, railroads, canals, and pipelines. These methods provide data for earthwork planning and alignment of proposed routes.  Profile leveling involves measuring elevations along a fixed line to create a vertical terrain profile. A surveyor sets up a leveling instrument at the benchmark (BM) and records a backsight (BS) to determine the...
204
Design Example: Alignment of a Road Line Using GIS01:17

Design Example: Alignment of a Road Line Using GIS

The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
47