Stability assessment of surrounding rock in downward mining route supported by slab-wall backfill structure
Yu Yin1,2,3, Shijiao Yang1, Yan He4
1School of Resources Environment and Safety Engineering, University of South China, Hengyang, 421001, Hunan, People's Republic of China.
Abstract:
Characteristic of ground pressure in surrounding rock is generally considered as the theoretical basis of parameter optimization for stope structure and technology. To explore the feasibility of efficient method for the second-step downward route backfill stopes in Shanjin gold mine, various numerical simulation methods were used to investigate the effect of slab-wall backfill structure on stability of surrounding rock in downward route mining system. The maximum principal stress, artificial false roof stress, and displacement were analyzed to evaluate the level of ground pressure in different mining areas. These results indicate the optimized structural parameters for backfill stopes, which may also provide a low-cost way to achieve a high safety for downward route mining system.
Related Concept Videos
Design Example: Maintaining Level of an Embankment
Wedges
Consider using a wedge to lift a heavy slab. Here, the wedge functions by converting the applied force into a much larger force directed almost perpendicular to the initial force. This...
Slump Test
Concrete is poured into the mold in three layers to conduct the test. Each layer is compacted 25 times with a steel tamping rod, which has a five-eighths-inch diameter and a rounded end, to ensure even distribution and eliminate...
Posttensioned Masonry Walls
Post-tensioned masonry walls use high-strength steel rods or flexible tendons to enhance the strength and efficiency of masonry structures. These elements are securely anchored to the foundation and extend vertically either within the cores of the masonry units or between the masonry wythes. The construction process involves building the wall with these tensioning elements in place and allowing the mortar to fully cure.
Following the curing process, the tensioning begins. Steel rods are...
Quarrying of Stone
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
Stability of structures