Related Experiment Video
Updated: Jun 21, 2025

The Transition to an Anterior-Based Muscle Sparing Approach Improves Early Postoperative Function but is Associated with a Learning Curve
Published on: September 7, 2022
The Impact of Changing From a 6+2 to a 3+1 Residency Block Schedule on Patient Access and Other Outcomes
Michael F Krug1, Alicia Carrasco2, Andrea S Christopher3
1is Associate Program Director, University of Washington (UW) Boise Internal Medicine Residency, and Clinical Associate Professor, Department of Medicine, University of Washington, Boise Veterans Affairs Medical Center (VAMC), Boise, Idaho, USA.
Abstract:
Background The "X+Y" residency scheduling model includes "X" weeks of uninterrupted inpatient or subspecialty rotations, followed by "Y" week(s) of uninterrupted outpatient rotations. The optimal ratio of X to Y is unclear. Objective Determine the impact of moving from a 6+2 to a 3+1 schedule on patient access to care, perceived quality of care, and resident/faculty satisfaction. Methods Our residency program switched from a 6+2 to a 3+1 scheduling model in July 2018. We measured access to care before and after the change using the "third next available" (TNA) metric. In June 2019, we administered a voluntary, anonymous, 20-item survey to residents, staff, and faculty who worked in resident clinic in both the 6+2 and 3+1 years. Results Patient access to appointments with their resident physician, as measured by TNA, improved significantly after the schedule change (mean 34.1 days in 6+2, mean 26.5 days in 3+1, P<.0001). Fifteen of 17 (88%) eligible residents and 13 of 24 (54%) faculty/staff filled out the voluntary anonymous survey. Surveyed residents and faculty/staff had concordant perception that the schedule change led to improvement in patient continuity, quality of care, and ability of residents to follow up on diagnostic tests and have regular interaction with clinic attendings. However, residents did not report a change in satisfaction with continuity clinic. Conclusions Changing from a 6+2 to a 3+1 schedule was associated with improvement in patient access to care. Residents and faculty/staff perceived that this schedule change improved several aspects of patient care.
Related Concept Videos
Methods of Documentation VI: Case Management Model
For example, a patient with a chronic...
Issues And Trends In Healthcare Delivery System
Cost Containment
Payment for healthcare services has historically promoted adoption of costly and often unnecessary or inefficient...
Methods of Documentation III: PIE
Planning Nursing Care I
Methods of Documentation II: POMR
Patient-centered Care

