Evaluation of land ecological security and driving factors in the Lower Yellow River Flood Plain based on quality,

Ge Zhai1, Peng Ren2, Ruihai Zhang2

  • 1School of Public Affairs, Zhejiang University, Hangzhou, 310058, China.

Scientific Reports
|January 21, 2025
PubMed

Related Concept Videos

Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
39
Applications of GIS: Disaster Management and Emergency Response01:29

Applications of GIS: Disaster Management and Emergency Response

Geographic Information System (GIS) technology is essential for risk identification, action prioritization, and resource optimization in critical situations like flooding and earthquakes. By integrating spatial and demographic data, GIS provides a comprehensive framework for emergency response.GIS integrates data layers, like rainfall intensity, topography, elevation profiles, and river levels, to model high-risk flood zones. These layers assess areas susceptible to flooding based on their...
36
Responses to Drought and Flooding02:41

Responses to Drought and Flooding

Water plays a significant role in the life cycle of plants. However, insufficient or excess of water can be detrimental and pose a serious threat to plants.
10.6K
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
51
Design Example: Alignment of a Road Line Using GIS01:17

Design Example: Alignment of a Road Line Using GIS

The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
38
Threats to Biodiversity01:50

Threats to Biodiversity

There have been five major extinction events throughout geological history, resulting in the elimination of biodiversity, followed by a rebound of species that adapted to the new conditions. In the current geological epoch, the Holocene, there is a sixth extinction event in progress. This mass extinction has been attributed to human activities and is thus provisionally called the Anthropocene. In 2019 the human population reached 7.7 billion people and is projected to comprise 10 billion by...
22.1K