Related Experiment Videos
A forecast-to-dispatch workflow for day-ahead operation of a regional natural gas transmission network based on
Ying Liu1, Yong Xiao2, Zhiping Tang3
1Surface Engineering Design Center, PetroChina Southwest Oil & Gasfield Company, Chengdu, China.
Abstract:
Day-ahead operation of regional natural gas transmission networks requires station demand forecasts and their translation into inventory-preparation references. This study evaluated a sequential forecast-to-dispatch workflow for the Chongqing regional gas network. Six forecasting models were assessed under a leakage-controlled 30-day walk-forward protocol. Across nine routine stations, mean station-level MAPE was 8.61% for SARIMAX, 8.95% for XGBoost, and 9.78% for GRU. The corresponding values were 10.93% for LSTM, 11.63% for BPNN, and 11.77% for CNN-BiLSTM-Attention. Station G was assessed separately as a data-quality boundary case; Station K was excluded because only 62 observations were available. An independent archived 18-day hourly dataset reported reconstruction MAPE of 6.7%-8.1% and peak-timing deviations of 1.0-1.5 h. A retrospective West-pipeline case for 22 April 2023 traced historical station forecasts through weighted aggregation, intermediate rounding, hourly reconstruction, and reduced-order linepack calculation. Its LFFX preparation target and the separate NGXDD and DLFX targets were 1.272, 4.702, and 1.571 × 10⁶ m³, respectively. All three targets passed case-specific deterministic inventory checks. The results support station-specific forecast-model selection and an explicit interface between daily prediction and segment-level inventory preparation.
Related Concept Videos
Load-frequency control
Maximum Power Flow and Line Loadability
Multimachine Stability
In analyzing the system, the nodal equations represent the relationship between bus voltages, machine voltages, and machine currents. The nodal equation is given by:
Fast Decoupled and DC Powerflow
The Power Flow Problem and Solution
Manipulation and Analysis