1Presbyterian Breast Center, Charlotte, NC 28204, USA.
You might also read
Articles linked to this work by shared authors, journal, and citation graph.
Screening-detected microcalcifications often lead to benign biopsies, increasing healthcare costs and patient morbidity. This study proposes improved mammographic evaluation and core biopsy use to enhance diagnostic accuracy and reduce unnecessary surgical procedures.
Area of Science:
Background:
Purpose of the Study:
Main Methods:
Main Results:
Conclusions: