Long-term ungrounded cable support for short-to-shield syndrome.

Brian Ayers1, Christina Cheyne1, Katherine Wood1

  • 1University of Rochester Medical Center Rochester NY USA.

Clinical Case Reports
|March 19, 2020
PubMed
Summary

Short-to-shield (STS) in HeartMate II LVAD patients can be managed with an ungrounded cable. This case series shows no complications in 17 patients over 13 years, suggesting long-term safety.

Related Concept Videos

Cable Subjected to Concentrated Loads01:28

Cable Subjected to Concentrated Loads

Flexible cables are commonly used in various applications for support and load transmission. Consider a cable fixed at two points and subjected to multiple vertically concentrated loads. Determine the shape of the cable and the tension in each portion of the cable, given the horizontal distances between the loads and supports.
1.3K
Cable Subjected to a Distributed Load01:24

Cable Subjected to a Distributed Load

The analysis of suspension bridges is a complex and critical process that involves multiple factors, including the shape and tension of the main cables. The main cables of suspension bridges are subjected to distributed loads, which result in changes in tensile forces and deformation of the cable. These loads must be carefully considered to ensure that the bridge is safe and capable of supporting the weight of different loads.
1.0K
Cable Subjected to Its Own Weight01:13

Cable Subjected to Its Own Weight

Overhead power transmission lines rely on cables to carry electricity across large distances. To ensure the stability and functionality of these lines, it is crucial to understand the shape and tension experienced by the cables under the influence of their weight.
A generalized loading function is employed to analyze a cable subjected to its own weight. This function considers the force acting along the cable's arc length rather than its projected length, providing a more accurate...
723
Cable: Problem Solving01:29

Cable: Problem Solving

When dealing with a cable that is fixed to two supports and subjected to uniform loading, it is crucial to determine the maximum tension in the cable. This process can be broken down into several key steps, as outlined below:
585
Equipotential Surfaces and Conductors01:16

Equipotential Surfaces and Conductors

For a conductor in which all charges are at rest, the conductor's surface is equipotential. The electric field is always perpendicular to equipotential surfaces. Therefore, in a conductor with static charges, the electric field just outside the conductor is always perpendicular to the conductor's surface. Any tangential component of the electric field will cause charges to move inside the conductor, which will violate the electrostatic nature of the system. In an electrostatic...
4.2K
Three-Phase Short Circuit—Unloaded Synchronous Machine01:21

Three-Phase Short Circuit—Unloaded Synchronous Machine

Conducting a three-phase short circuit test on an unloaded synchronous machine helps understand its impact on the system. The AC fault current's oscillogram, with the DC offset removed, reveals that the waveform amplitude decreases from an initially high value to a steady-state level for one phase of the machine.
This behavior occurs due to the magnetic flux produced by the short-circuit armature currents. Initially, these currents follow high-reluctance paths but eventually shift to...
606