Adaptive Channel Division and Subchannel Allocation for Orthogonal Frequency Division Multiple Access-Based Airborne

Ruowen Yan1, Qiao Li1, Huagang Xiong1

  • 1School of Electronic Information Engineering, Beihang University, Beijing 100083, China.

PubMed

Related Concept Videos

Maximum Power Flow and Line Loadability01:23

Maximum Power Flow and Line Loadability

The maximum power flow for lossy transmission lines is derived using ABCD parameters in phasor form. These parameters create a matrix relationship between the sending-end and receiving-end voltages and currents, allowing the determination of the receiving-end current. This relationship facilitates calculating the complex power delivered to the receiving end, from which real and reactive power components are derived.
94
Transmission Line Design Considerations01:23

Transmission Line Design Considerations

Aluminum has become the material of choice for overhead transmission lines, surpassing copper due to its abundance and cost-effectiveness. The most prevalent type is the aluminum conductor, steel-reinforced (ACSR), which combines aluminum strands around a steel core. Other variants include all-aluminum conductors (AAC), all-aluminum alloy conductors (AAAC), aluminum conductor alloy-reinforced (ACAR), and aluminum-clad steel conductors. Advanced designs, such as aluminum conductors with steel...
120
Pilot and Numeric Relaying01:21

Pilot and Numeric Relaying

Pilot relaying is a type of differential protection used in power systems. It compares electrical quantities at the terminals of equipment via a communication channel instead of direct relay interconnection. This method is essential for transmission lines where the terminals are far apart, typically up to 80 km for lines with 69 to 115 kV ratings. Four types of communication channels are used for pilot relaying:
78
Load-frequency control01:28

Load-frequency control

Load-frequency control (LFC) is vital for maintaining power system stability, ensuring that frequency and power flows remain within acceptable limits during load changes. Turbine-governor control eliminates rotor accelerations and decelerations following load changes. However, a steady-state frequency error persists when the change in the turbine-governor reference setting is zero. In an interconnected power system, each area agrees to export or import a scheduled amount of power through...
121
Maximum Power Transfer01:16

Maximum Power Transfer

Numerous practical applications within engineering disciplines, such as telecommunications, necessitate optimizing power delivery to a connected load. This pursuit, however, entails inherent internal losses, which can either equal or exceed the power supplied to the load. The Thevenin equivalent circuit is helpful in finding the maximum power a linear circuit can deliver to a load. It is assumed in this context that the load resistance can be adjusted.
By substituting the entire circuit with...
225
Fast Decoupled and DC Powerflow01:24

Fast Decoupled and DC Powerflow

The fast decoupled power flow method addresses contingencies in power system operations, such as generator outages or transmission line failures. This method provides quick power flow solutions, essential for real-time system adjustments. Fast decoupled power flow algorithms simplify the Jacobian matrix by neglecting certain elements, leading to two sets of decoupled equations:
171